180TH STREET BRIDGE

180TH STREET BRIDGE

NFPS designed a rehabilitation strategy to brace and shore a structurally deficient bridge in southern Suwannee County. The major items of work were designing a temporary conveyance path for the creek flow, erosion and sediment control, construction of a concrete stem wall along each barrel, reinforcing the joints of the plate arch walls, backfilling voids with pressure grouting and strengthening the existing guardrail across the bridge.

CLIENT REFERENCE

Suwannee County BOCC
13150 80th Terrace
Live Oak, FL 32060
Contact: Debbie Vickers
(386) 364-3400

PROJECT TYPE

Transportation

Project Manager

James H. Pitman, PE
(386) 752-4675
Email