SR 6/I-75 Utilities Master Plan
NFPS performed a feasibility study, master plan and completed the engineering design and cost estimates for Hamilton County’s owned and operated 125,000 gallon-per-day (GPD) potable water supply and distribution system and a 125,000 gallon per day modular waste water treatment plant that can be expanded in 125,000 GPD increments up to a 500,000 GPD capacity.
The project also included a 19.17-acre effluent spray field to serve the Phase 1 Planning Area along SR-6 east and west of the I-75/SR-6 intersection (Exit 460).
In addition to design and engineering work on this multimillion dollar project, the Grants Department assisted with the acquisition of funding. NFPS assisted with the application for funding through FDEP/SRF, as well as additional resources through the Suwannee River Water Management District. NFPS also supplied bid preparation, negotiation, and construction contract administration.
Client Reference
Hamilton County BOCC
207 NE First Street
Jasper, FL 32052
Louie Goodin,
County Coordinator
386-792-6639
Project Type
Project Manager
Gregory G. Bailey, PE
386-752-4675
Email